46 Solution 2.3 Installation and Operation Manual
Pedestal kit installation:
Follow step 1, 2 and 3 of the leg kit
installation.
5- Secure pedestal base to the
underside of the firebox using the
bolts, washers and nuts removed in
step 3.
Note: Insert each bolt from the inside of
the firebox, this will allow the bricks to sit
more evenly on the floor of the firebox.
6- Gently flip the stove back on its
pedestal making sure not to put too
much weight on the rear edge of the
base.
7- Secure the air control cover to the
brackets under the ash lip with 2
screws then install the coil handle on
the control rod by turning it
counterclockwise.
8- Secure the pedestal backing panel to
the rear of the pedestal.
9- Open the ash drawer lid then slide it
into the front opening of the pedestal.
10- Position the stove for its installation
and reinstall the door and the bricks
(see Appendix 9: Exploded Diagram
and Parts List for layout).
Note: Make sure that baffle components
have not moved during the leg installation
process since a flue blockage may occur.